AUDITEE: Amin Internet Data Center
CERTIFICATE BODY: Arian TUV Pasargad
PROJECT TITLE: Amin Data Center, Evaluation Audit Based on DCAS-2.0 Criteria
PROJECT TIME: Start: Oct. 2021 / End: Feb. 2022
PROJECT SCOPE:
Providing evaluation audit services for Amin data center, Based on DCAS criteria version 2.0, Accredited by of ITO of Iran.
Stage 1: Design documents
Stage 2: Site infrastructure
Stage 1 & Stage 2 Criteria Assessment, including:
— Telecommunications
— Architectural
— Electrical
— Mechanical
DATA CENTER FEATURES:
Equipment capacity: 44 racks
Evaluation rating: 2
Infrastructure complexity: 25
IT power capacity: 132 kW
Total power capacity: 300 kW
CLIENT: Asiatech
PROJECT TITLE: Asiatech, Miremad Data Center, Tiering Assessment Consultancy Based On Dcas-1.5-1 Criteri
PROJECT TIME: Start: Jul. 2021 / End: Aug. 2021
PROJECT SCOPE:
Providing tiering and criteria assessment consultancy services for Asiatech data center, located in Asiatech Miremad building, based on DCAS criteria version 1.5, amendment 1, a joint requirement of ITO of Iran & Iranian ICT Guild Organization.
Stage 1: Design documents
Stage 2: Site infrastructure
Stage 1 & stage 2 criteria assessment, including:
— Telecommunications
— Architectural
— Electrical
— Mechanical
DATA CENTER FEATURES:
Equipment capacity: 198 Racks
Assessment rating: 3
Infrastructure complexity: 25
IT power capacity: 690 kW
Total power capacity: 1,250 kW
AUDITEE: Afranet
CERTIFICATION BODY: TUV Austria (PN-Iran)
PROJECT TITLE: Afranet, Sahand Data Center, Evaluation Audit Based on DCAS-1.5-1 Criteria
PROJECT TIME: Start: Jun. 2021 / Aug. 2021
PROJECT SCOPE:
Providing evaluation audit services for Afranet Co. data center, located in Afranet Sahand building, Based on DCAS criteria version 1.5, amendment 1, accredited by ITO of Iran.
Stage 1: Design documents
Stage 2: Site infrastructure
Stage 1 & stage 2 criteria assessment, including:
— Telecommunications
— Architectural
— Electrical
— Mechanical
DATA CENTER FEATURES:
— Equipment capacity: 60 racks
— Evaluation rating: 2
— Infrastructure complexity: 25
— IT power capacity: 300 kW
— Total power capacity: 650 kW
CLIENT: Karafarin Bank
PROJECT TITLE: Karafarin Bank, Bokharest Data Center, Project Management Consulating
PROJECT MANAGER: Hamed Moinfar
GC: Karafarin Negah Co.
CLIENT PROJECT MANAGER: Mr. Mousavi
PROJECT LOCATION: No.36 – W. Nahid St. – Valiasr Ave.
PROJECT DATE: Start: 22/12/2021— End: 20/02/2022
PROJECT DESCRIPTION:
Providing management consulting services including:
— Provide consulting services for the most suitable solution to be implemented.
— Review and revise tender documents, evaluation criteria, and RACIs.
— Advice, lead, and support required processes for a successful tender.
— Evaluate bidders’ submittals, select and announce the tender winner.
PROJECT FEATURES:
— Gross data center areas: 645 m2
— Computer rooms areas: 116 m2
— Equipment: 38 standard racks
— IT power capacity: 360 kW
— Total power capacity: 530 kW
PROJECT SCOPE:
Professional consultancy services to manage the tender:
— Revising data center architectural design
— Preparing qualitative evaluation criteria
— Preparing technical criteria for electrical and low current systems
— Preparing technical criteria for mechanical, safety, and security systems
— Preparing technical criteria for network communications (passive cabling)
CLIENT: Tourism Bank
PROJECT TITLE: Tourism Bank, Farhang Bldg. Telecommunications & Power Distribution, Test & Commissioning, Project Management
PROJECT MANAGER: Hamed Moinfar
GC: PATSA Co.
CLIENT PROJECT MANAGER: Mr. Barati
PROJECT LOCATION: Farhang Building- Noor St.-Farhang Blvd.- Saadat Abad- Tehran- Iran
PROJECT DATE: Start: 05/12/2020 — End: 05/03/2021
PROJECT DESCRIPTION:
Providing project management services for inspection, modification, redesign & implementation of data and power networks on user access layer, located in Tourism Bank Farhang building, including:
— Network testing & cabling modification.
— Replacement & installation of network nodes.
— Power panels & sockets modification.
— TR racks installation & arrangement.
— Data network Fluke test & labeling.
— Prepare port mapping & cabling drawings.
— Check bonding & grounding system, and provide power test reports.
PROJECT FEATURES:
— Office building: 60,000 m2, 25 floors
— Service areas: 26,000 m2, 16 floors
— Computer rooms area: 100 m2
— Data network: 6000 links & 12000 connections
PROJECT SCOPE:
— Access layer passive network
— Access layer active network
— Power connections to users
CLIENT: Golrang Industrial Group
PROJECT TITLE: Golrang Industrial Group, Saei Data Center Project, Design Supervision Services
PROJECT MANAGER: Hamed Moinfar
CLIENT PROJECT MANAGER: Mr. Naeimi
PROJECT LOCATION: No.1- 1st Saei St.- North of Saei Park- Valiasr St.- Tehran- Iran
PROJECT DATE: Start: 07/08/2020 — End: 02/03/2021
PROJECT DESCRIPTION:
Providing supervisory services for conceptual and basic design of Golrang Industrial Group’s data center project, located in Saei Tower through two design & redesign phases. This project was completed under the management of Golrang System Co.
PROJECT FEATURES:
— Gross data center areas: 453 m2
— Computer rooms areas: 100 m2
— Facility & support areas: 353 m2
— Equipment: 42 standard racks
— IT power capacity: 300 kW
— Total power capacity: 700 kW
— Power supply & dist. redundancy: N+1
— Cooling supply & dist. redundancy: N+1
PROJECT SCOPE:
— Architecture & layout
— Power supply, distribution & protection
— Cooling & mechanical
— Safety & physical Security
CLIENT: A. Q. RAZAVI
PROJECT TITLE: Razavi, HQ Data Center, Tiering Assessment Consultancy Based on DCAS-2.0 Criteria
PROJECT MANAGER: Hamed Moinfar
Contractor: Pardis Diba Andishan Co.
CLIENT PROJECT MANAGER: Mr. Masoudipour
PROJECT LOCATION: Razavi Information Technology Center – Holy Shrine – Mashhad – IRAN
PROJECT DATE: Start: 23/09/2021 — End: 23/10/2021
PROJECT DESCRIPTION:
Providing tiering and criteria assessment consultancy services for Razavi data center, based on DCAS criteria version 2.0, a joint requirement of ITO of Iran & Iranian ICT Guild Organization.
Stage 1: Design documents
Stage 2: Site infrastructure
PROJECT FEATURES:
— Equipment: 32 Standard Racks
— Tiering assessment: 2
— Gross data center areas: 554 m2
— IT power capacity: 150 kW
— Total power capacity: 300 kW
PROJECT SCOPE:
Stage 1 & Stage 2 Criteria Assessment:
— Telecommunications
— Architectural
— Electrical
— Mechanical
CLIENT: CPIIR
PROJECT TITLE: CPIIR, Central Office Server Room Project, Engineering Consultancy & Project Management Contract
PROJECT MANAGER: Hamed Moinfar
GC: Royal Pardaz Co.
CLIENT PROJECT MANAGER: Dr. Mofazzali
PROJECT LOCATION: No.31- Helali St.- Felestin St. – Tehran- Iran
PROJECT DATE: Start: 31/10/2020 — End: —
PROJECT DESCRIPTION:
Providing consultancy services for basic and detail design, project management, modification and completion of CPIIR, central office server room.
This project had been kept inactive in mid-way for 3 years, due to some technical and contractual issues, before being re-initiated again.
PROJECT FEATURES:
— Gross data center areas: 350 m2
— Computer rooms areas: 170 m2
— Facility & support areas: 180 m2
— Equipment: 26 standard racks
— IT power capacity: 112 kW
— Total power capacity: 300 kW
— Power supply & dist. redundancy: N+1
— Cooling supply & dist. redundancy: N+1
PROJECT SCOPE:
— Architecture & EMP protection
— Power supply, distribution & protection
— Cooling & mechanical
— Safety & physical Security
— Network and telecommunications
— Storage and backup
— Processing and virtualization
Company Info
PENDAR ARIA
TECH ENGINEERS CO.
No.8, Sherkat-E Bargh Blvd,
Kooye Faraz, Sa'adat Abad, Tehran, 1981965849, Iran
© PENDARIA, 2023
All Rights Reserved.
Follow us
Contact Us
Email: Info@pendaria.com
Tel: +98 (21) 22094794