Every project is as if a blank canvas in which we paint and realize our ideas. It is with a dynamic imagination that PENDARIA aims to create new solutions and bind you with your excellent tomorrow.

TOTAL PROJECTS

21 Data Centers

Since Pendaria

18 Data Centers

Prior to Pendaria

TOTAL SPACE

3,830 Cabinets

Since Pendaria

4,300 Cabinets

Prior to Pendaria

TOTAL IT POWER

23.1 Megawatt

Since Pendaria

35.0 Megawatt

Prior to Pendaria

AUDITEE: Amin Internet Data Center
CERTIFICATE BODY: Arian TUV Pasargad
PROJECT TITLE: Amin Data Center, Evaluation Audit Based on DCAS-2.0 Criteria

PROJECT TIME: Start: Oct. 2021 / End: Feb. 2022

PROJECT SCOPE:

Providing evaluation audit services for Amin data center, Based on DCAS criteria version 2.0, Accredited by of ITO of Iran.

Stage 1: Design documents
Stage 2: Site infrastructure

Stage 1 & Stage 2 Criteria Assessment, including:

— Telecommunications
— Architectural
— Electrical
— Mechanical

DATA CENTER FEATURES:

Equipment capacity: 44 racks
Evaluation rating: 2
Infrastructure complexity: 25
IT power capacity: 132 kW
Total power capacity: 300 kW

CLIENT: Asiatech
PROJECT TITLE: Asiatech, Miremad Data Center, Tiering Assessment Consultancy Based On Dcas-1.5-1 Criteri

PROJECT TIME: Start: Jul. 2021 / End: Aug. 2021

PROJECT SCOPE:

Providing tiering and criteria assessment consultancy services for Asiatech data center, located in Asiatech Miremad building, based on DCAS criteria version 1.5, amendment 1, a joint requirement of ITO of Iran & Iranian ICT Guild Organization.

Stage 1: Design documents
Stage 2: Site infrastructure

Stage 1 & stage 2 criteria assessment, including:

— Telecommunications
— Architectural
— Electrical
— Mechanical

DATA CENTER FEATURES:

Equipment capacity: 198 Racks
Assessment rating: 3
Infrastructure complexity: 25
IT power capacity: 690 kW
Total power capacity: 1,250 kW

AUDITEE: Afranet
CERTIFICATION BODY: TUV Austria (PN-Iran)
PROJECT TITLE: Afranet, Sahand Data Center, Evaluation Audit Based on DCAS-1.5-1 Criteria

PROJECT TIME: Start: Jun. 2021 / Aug. 2021

PROJECT SCOPE:

Providing evaluation audit services for Afranet Co. data center, located in Afranet Sahand building, Based on DCAS criteria version 1.5, amendment 1, accredited by ITO of Iran.

Stage 1: Design documents
Stage 2: Site infrastructure

Stage 1 & stage 2 criteria assessment, including:

— Telecommunications
— Architectural
— Electrical
— Mechanical

DATA CENTER FEATURES:

— Equipment capacity: 60 racks
— Evaluation rating: 2
— Infrastructure complexity: 25
— IT power capacity: 300 kW
— Total power capacity: 650 kW

CLIENT: Karafarin Bank
PROJECT TITLE: Karafarin Bank, Bokharest Data Center, Project Management Consulating
PROJECT MANAGER: Hamed Moinfar
GC: Karafarin Negah Co.

PROJECT DATE: Start: 22/12/2021— End: 20/02/2022

 

PROJECT DESCRIPTION:

Providing management consulting services including:

— Provide consulting services for the most suitable solution to be implemented.
— Review and revise tender documents, evaluation criteria, and RACIs.
— Advice, lead, and support required processes for a successful tender.
— Evaluate bidders’ submittals, select and announce the tender winner.

PROJECT SCOPE:

Professional consultancy services to manage the tender:

— Revising data center architectural design
— Preparing qualitative evaluation criteria
— Preparing technical criteria for electrical and low current systems
— Preparing technical criteria for mechanical, safety, and security systems
— Preparing technical criteria for network communications (passive cabling)

PROJECT FEATURES:
— Gross data center areas: 645 m2
— Computer rooms areas: 116 m2
— Equipment: 38 standard racks
— IT power capacity: 360 kW
— Total power capacity: 530 kW

 

CLIENT: Tourism Bank
PROJECT TITLE: Tourism Bank, Farhang Bldg. Telecommunications & Power Distribution, Test & Commissioning, Project Management
PROJECT MANAGER: Hamed Moinfar
GC: PATSA Co.

PROJECT DATE: Start: 05/12/2020 — End: 05/03/2021

 

PROJECT DESCRIPTION:
Providing project management services for inspection, modification, redesign & implementation of data and power networks on user access layer, located in Tourism Bank Farhang building, including:
— Network testing & cabling modification.
— Replacement & installation of network nodes.
— Power panels & sockets modification.
— TR racks installation & arrangement.
— Data network Fluke test & labeling.
— Prepare port mapping & cabling drawings.
— Check bonding & grounding system, and provide power test reports.

PROJECT SCOPE:
— Access layer passive network
— Access layer active network
— Power connections to users

CLIENT: Golrang Industrial Group
PROJECT TITLE: Golrang Industrial Group, Saei Data Center Project, Design Supervision Services
PROJECT MANAGER: Hamed Moinfar


PROJECT DATE: Start: 07/08/2020 — End: 02/03/2021

 

PROJECT DESCRIPTION:
Providing supervisory services for conceptual and basic design of Golrang Industrial Group’s data center project, located in Saei Tower through two design & redesign phases. This project was completed under the management of Golrang System Co.

PROJECT SCOPE:
— Architecture & layout
— Power supply, distribution & protection
— Cooling & mechanical
— Safety & physical Security

PROJECT FEATURES:
— Gross data center areas: 453 m2
— Computer rooms areas: 100 m2
— Facility & support areas: 353 m2
— Equipment: 42 standard racks
— IT power capacity: 300 kW
— Total power capacity: 700 kW
— Power supply & dist. redundancy: N+1
— Cooling supply & dist. redundancy: N+1

CLIENT: A. Q. RAZAVI
PROJECT TITLE: Razavi, HQ Data Center, Tiering Assessment Consultancy Based on DCAS-2.0 Criteria
PROJECT MANAGER: Hamed Moinfar
CONTRACTOR: Pardis Diba Andishan Co.

PROJECT DATE: Start: 23/09/2021 — End: 23/10/2021

 

PROJECT DESCRIPTION:

Providing tiering and criteria assessment consultancy services for Razavi data center, based on DCAS criteria version 2.0, a joint requirement of ITO of Iran & Iranian ICT Guild Organization.

Stage 1: Design documents
Stage 2: Site infrastructure

PROJECT SCOPE:
Stage 1 & Stage 2 Criteria Assessment:
— Telecommunications
— Architectural
— Electrical
— Mechanical

PROJECT FEATURES:
— Equipment: 32 Standard Racks
— Tiering assessment: 2
— Gross data center areas: 554 m2
— IT power capacity: 150 kW
— Total power capacity: 300 kW

CLIENT: CPIIR
PROJECT TITLE: CPIIR, Central Office Server Room Project, Engineering Consultancy & Project Management Contract
PROJECT MANAGER: Hamed Moinfar
GC: Royal Pardaz Co.

PROJECT DATE: Start: 31/10/2020 — End: —

 
 

PROJECT DESCRIPTION:

Providing consultancy services for basic and detail design, project management, modification and completion of CPIIR, central office server room.
This project had been kept inactive in mid-way for 3 years, due to some technical and contractual issues, before being re-initiated again.

PROJECT SCOPE:
— Architecture & EMP protection
— Power supply, distribution & protection
— Cooling & mechanical
— Safety & physical Security
— Network and telecommunications
— Storage and backup
— Processing and virtualization

PROJECT FEATURES:
— Gross data center areas: 350 m2
— Computer rooms areas: 170 m2
— Facility & support areas: 180 m2
— Equipment: 26 standard racks
— IT power capacity: 112 kW
— Total power capacity: 300 kW
— Power supply & dist. redundancy: N+1
— Cooling supply & dist. redundancy: N+1